Estimator’s Review Checklist Date Job NumberCustomerAccount Manager--Choose Option--JMMWVGEstimator--Choose Option--CVJKBEMContact PersonEmail Address1. Did the client offer a pre-bid inspection of the job site?: YesNoN/aNotes2. Do you have a complete set of drawings?: YesNoN/aNotes3. Even if we are not including a demo, does the demo plan interact with the finish-plan?: YesNoN/aNotes4. Did the RCP show any applicable finishes?: YesNoN/aNotes5. Do any sectionals show any applicable finishes?: YesNoN/aNotes6. Does that architect directly express "start points" or "alignment" for any finishes?: YesNoN/aNotes7. Did you review the room finishes schedule alone or with other team members?: YesNoN/aNotes8. Have these inconsistencies been verbally reviewed by two team members?: YesNoN/aNotes9. Where does the architect used UNO (Unless Noted Otherwise) in the drawings?: YesNoN/aNotes10. Did you review the room finish schedule? Specifically the 4 sides of room for walls and base?: YesNoN/aNotes11. Are there light coves at tiled walls?: YesNoN/aNotes12. If tile, does the plan require “epoxy” grout or setting materials? Or furan grout?: YesNoN/aNotes13. How about moisture & crack isolation membrane?: YesNoN/aNotes14. Is there any work for us on exterior walls?: YesNoN/aNotes15. Are there any special sealers required for specialty floors? (example… rubber flooring, sheet vinyl, ect..): YesNoN/aNotes16. If estimating large format tile, does it need to be priced as countertop labor?: YesNoN/aNotes17. If estimating mosaic tiles for wall/floor, does it need to have additional labor costs?: YesNoN/aNotes18. Do any of the bundles require a trip charge?: YesNoN/aNotes19. Is there a sectional of the countertops provided?: YesNoN/aNotes20. Are there any patterns, repeats or designs that need to be considered, extra material and/or cost?: YesNoN/aNotes21. Does the tile work require thin-set or mud-set installation?: YesNoN/aNotes22. Did you verify the tax scenario?: YesNoN/aNotes24. Did you update the Estimate notes section?: YesNoN/aNotes25. Is there double-stick padding requested?: YesNoN/aNotes26. Are details for shower and shower sloping?: YesNoN/aNotes28. Did you review the Spec (div 0-22) provided for special notes?: YesNoN/aNotes29. Did they describe schluters in the plans? Dilex and/or coved description?: YesNoN/aNotes30. Did they describe how to cap off the exposed tile (base, wall edges, etc…): YesNoN/aNotes31. Do we need to float to the top of the window mullions? If yes, this could be a huge change order: YesNoN/aNotes32. If large format tile is being used, did you use a piece count or “re-use greater than 50%” in MS w an extra waste ratio?: YesNoN/aNotes33. For commercial bathroom layout, will the layout affect the waste ration needed?: YesNoN/aNotes34. Example… If you have a tile that is 24” x 24” and a 9ft tall wall, are you using 50% of the cut tiles to complete the last row?: YesNoN/aNotesAre you verifying if that is actually possible?: YesNoN/aNotesApprove to SendAdjust and SendAdjust and Review AgainSubmit Form